Herunterladen Diese Seite drucken

AEG EM 50-2 Montageanleitung Seite 4

Elektronischer eismelder
Vorschau ausblenden Andere Handbücher für EM 50-2:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

FIGURES
Fig. 1 Installation of EF 50-25 H ground sensor
Fig. 2 Installation of F 50-10 RH gutter sensor
and ATF 5 outdoor sensor
1 Thermostat EM 50-2
2 Gutter sensor
3 Outdoor sensor
Fig. 3 One-zone electric heating with
EF 50-25 H sensor
Fig. 4 One-zone electric heating with
F 50-10 RH/ATF 5 sensor
Fig. 5 Two-zone electric heating (roof/ground)
Fig. 6 EF 50-25 H connection
Fig. 7 F 50-10 RH connection
Fig. 8 Heating cable connection, example
Fig. 9 Two-stage electric heating control (Y/∆)
Fig. 10 Advanced 2-step connection Y/∆
Fig. 15 Connections for remote control of
standby and forced heat
Fig. 17 EM 50-2 controller, terminal overview
4
© 2012 OJ Electronics A/S - EHT Haustechnik GMBH

Werbung

loading