Herunterladen Inhalt Inhalt Diese Seite drucken

Front Control Panel; Maintenance; Responsibility - voestalpine Bohler Welding WU 430 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 30

3.2 Front control panel

1
2

4. MAINTENANCE

Routine maintenance must be carried out on the system according to the manufacturer's instructions. When the
equipment is working, all the access and operating doors and covers must be closed and locked. The system must
not be modified in any way. Prevent conductive dust from accumulating near the louvers and over them.
Any maintenance operation must be performed by qualified personnel only. The repair or replacement of any parts
in the system by unauthorised personnel will invalidate the product warranty. The repair or replacement of any parts
in the system must be carried out only by qualified personnel.
4.1 Carry out the following periodic checks on the power source
• Check the state of the hose connections.

4.2 Responsibility

Failure to carry out the above maintenance will invalidate all warranties and exempt the manufacturer from any
liability. The manufacturer disclaims any responsibility if the user fails to follow these instructions. For any doubts
EN
IEC
and/or problems do not hesitate to contact your nearest customer service centre.
Cooling liquid outlet connector
1
Cooling liquid inlet connector
2
21
MAINTENANCE
EN

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis