4.2 Methodensequenzen
Methode 2
760 Sample Changer
parameters
method
number of samples:
>start sequence
1 CTL:Rm:
2 SAMPLE:
3 SAMPLE:
>sample sequence
1 SHIFTRATE:
2 MOVE
1
3 LIFT: 1
:
4 STIR: *
5 CTL:Rm:
6 WAIT
7 CTL:Rm:
8 SCN:Rm
9 STIR: *
10 LIFT: 1
:
11 WAIT
12 SHIFTRATE:
13 MOVE
1
14 LIFT: 1
:
15 STIR: *
16 WAIT
17 STIR: *
18 LIFT: 1
:
19 WAIT
>final sequence
1 MOVE
1
2 LIFT: 1
:
>changer settings
rack number
lift rate
shift rate
shift direction:
beaker test mode:
on beaker error:
>stirring rates
stirrer 1
stirrer 2
>dosing unit def.
>manual stop
CTL Rmt:
CTL RS232:
26
760.0012
760_2
rack
INIT
-
1
+
1
+
20
:
sample
work mm
:
ON s
START dos*
10 s
START device1
:
End1
:
OFF s
shift mm
3 s
-
20
:
spec.1
work mm
:
ON s
5 s
:
OFF s
shift mm
3 s
:
spec.1
work mm
0
25 mm/s
20
auto.
single
MOVE
3
3
STOP device1
------------
¬ Report-Header mit Programmversion
¬ Methodenname
¬ Anzahl der abzuarbeitenden Proben (hier
ganzes Probenrack)
¬ Remote Schnittstelle initialisieren
¬ Initialisierung der
¬ Probenposition
¬ Drehrichtung des Racks aufsteigend
¬ nächste Probe vor Turm fahren
¬ Lift mit Titrierkopf in Arbeitsposition fahren
¬ Rührer einschalten
¬ Dosieren starten
¬ Wartezeit: 10 Sek.
¬ Titrino starten
¬ Ende der Titration abwarten [EOD]
¬ Rührer ausschalten
¬ Lift mit Titrierkopf in Drehposition fahren
¬ Wartezeit: 3 Sek. Abtropfen lassen
¬ Drehrichtung des Racks absteigend
¬ Konditionierbecher vor Turm fahren
¬ Elektrode eintauchen
¬ Rührer einschalten
¬ Wartezeit: 5 Sek.
¬ Rührer ausschalten
¬ Lift mit Titrierkopf in Drehposition fahren
¬ Wartezeit: 3 Sek. Abtropfen lassen
¬ Konditionierbecher vor Turm fahren
¬ Elektrode eintauchen
------ Einstellungen für Wechslerfunktionen --------
¬ bei fehlendem Probenbecher wird automatisch
der nächste angefahren
------ Rührgeschwindigkeiten ---------------------------
------ Einstellungen für Dosiergeräte (hier keine) --
------ Reaktion auf manuellen Abbruch --------------
¬ Gerät 1 stoppen
Probenwechsler 760, Anhang