Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Operation; Control Elements - Bosch Rexroth SE301 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
3 609 929 720/1.2 | SE301

5 Initial Operation

5
Initial Operation
Before initial operation, the proper seat of all
jumpers must be ensured.
5.1

Control elements

On the front plate of the tightening system
control SE301 two LEDs are installed to indi-
cate the operating condition:
green
flashing red
LED
flashing green not ready for
flashing red
LED
green
Fig. 2:
1) Possible causes: Spindle in bypass,
Spindle in operating test
5.2
Interface X 6: RS232
This interface is intended for connecting a
programming device.
1
5
6
9
Fig. 3:
SUB-D-plug, 9pin
Pin
Signal
Description/Function
1
-
2
RxD
RS232 Receive
3
TxD
RS232 Send
4
DTR
5 V Supply for display
5
GND
Reference potential logic
6
-
7
RTS
RS232 Request Send
8
CTS
RS232 Enable Send
9
-
Table 3:
Electric Drives and Controls | Bosch Rexroth AG 11 /36
5.3
Two inputs and outputs, which can be proc-
essed in the tightening program, are integrat-
ed in the SE301.
To use the inputs via external sensors, the
24-V-potential can be used by the internal
power supply.
1
ready for operation
system error
2
1)
operation
3
NIO
IO
4
5
6
Fig. 4:
Type of plug: e. g. Make Phönix contact,
MC 1,5/6-ST-3,5
Pin
1
2
3
4
5
6
Table 4:
X 7 Interface: 24 V I/O
Strip terminal, 6pin
Signal Description/
Function
IN1
Input 1
IN2
Input 2
OUT1
Output 1
OUT2
Output 2
24 V
24 V
for inputs
0 V
Reference potenti-
al for outputs
Voltage/
Current/
Standard
24 V DC
DIN 19 240
24 V DC
DIN 19 240
24 V DC/
100 mA
DIN 19 240
24 V DC/
100 mA
DIN 19 240
24 V DC/
300 mA
DIN 19 240
24 V DC /
DIN 19 240

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

0 608 830 160

Inhaltsverzeichnis