Softening  Plant  HT-­613,  618  and  621
Start-­up  procedures
B.  
When  the    lter  has  been  installed,  following  things  should  be  checked:
1.  
Check  that  the  number  (see  encl.  diagram  
page  26)  of  the  standard-­mounted  regeneration  
meter  disk    ts  the  actual  hardness  on  site.  If  
not,  the  meter  disk  (water  meter)  must  be  ex-­
changed,  see  illustrations  on  page  25.  You  can  
order  the  correct  meter  disc  from  Kinetico  or
from  your  supplier  
2.  
The  brine  valve  has  been  pre-­adjusted  in  our  
factory,  but  it  should  always  be  checked  that  the    oat  is  
halfway  up  the  shaft  as  a  minimum  when  looking  from  
the  top  of  the    oat.  The  water  must  be  above  the  grid  
plate  in  order  to  be  in  contact  with  the  salt.  The  yellow  
plastic  safety  mechanism  under  the    oat  cup  must  be  
pressed  home.
3.  
The  valves  on  the  in-­  and  outlet  side  and  the  bypass  
valve  (if    tted)  must  be  closed.
4.  
Open  the  valves  at  the  intake  side  a  little  so  that  the    lter  
slowly    lls  with  water.   A t  the  same  time  water  will  be    l-­
led  into  the  brine  tank  by  means  of  the  brine  valve.
5.  
Put  the  one  and  then  the  other  tank  in  backwash  posi-­
tion  for  a  while  to  get  any  air  out  of  the  system.  
This  is  done  by  pressing  down  the  crosshead  
screw  in  the  middle  of  the  automatism  and  
simultaneously  turning  it  clockwise.  Check  that  
this  makes  the  water  run  out  of  the  discharge  
hose  to  drain.
6.  
When  the  air  is  out,  put  the    lter  in  operation  
(at  position  12  or  6  o'clock)  by  turning  the  cros-­
shead  screw  once  more.
7.  
Then  open  the  valves  on  the  outlet  and  intake  
sides  completely.
8.  
Check  that  water  runs  into  the  brine  tank.  Check  that  the  water  is  above  the  
grid  plate  (approx.  5  cm  above).
9.  
Fill  up  the  tank  with  salt  tablets.
10.  
Normally  there  shall  be  enough  salt  in  the  cabinet  to  cover  the  water  com-­
pletely.
11.  
Now  the  plant  is  ready  for  service  and  will  supply  softened  water  instantly.
CC 206
0,22kg=122mm
0,45kg=146mm
CC 208
0,45kg=133mm
0,65kg=146mm
Float Cup
Height
23