Important
Before it is put into service, the system must
be tested to check the operating conditions
of every single component and identify any
malfunctions. In this stage, it is important to
check that all health and safety requirements
have been complied with in full.
To test the system, make the following checks:
Turn on the gas supply tap and check that the
1)
connections are right.
Check that the mains gas is the same as that
2)
used for commissioning of the appliance, and
carry out the conversion procedure if necessa-
ry (see page 10).
Check that the top and oven burners are ligh-
3)
ting correctly and their combustion.
GB
3319970_inst_GB_rev.1
TESTING OF THE APPLIANCE
Check the gas pressure and fl ow-rate at
4)
minimum and maximum settings and adjust if
necessary (see page 6).
Check that the safety thermocouple is wor-
5)
king correctly.
Check that there are no gas leaks.
6)
Check that the nameplates specify the correct
7)
gas for the country of use.
After testing, if necessary instruct the user in all
the skills necessary for putting the appliance
into operation in conditions of safety, in accor-
dance with legal requirements.
- 12 -
ENGLISH