Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting The Switch - FS S3900 Serie Schnellstartanleitung

Managed-l2+-gigabit-switch
Vorschau ausblenden Andere Handbücher für S3900 Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Site Environment:
Do not operate it in an area that exceeds an ambient temperature of 50°C.
The installation site must be well ventilated. Ensure that there is adequate air ow around the
switch.
Be sure that the switch is level and stable to avoid any hazardous conditions.
Do not install the equipment in a dusty environment.
The installation site must be free from leaking or dripping water, heavy dew, and humidity.
Ensure rack and working platforms are well earthed.

Mounting the Switch

Desk Mounting
1. Attach four rubber pads to the bottom.
2. Place the chassis on a desk.
NOTE:
Do not put things weighing 4.5 kg or over 4.5 kg on the top of the switch.
6

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

S3900-24t4s-rS3900-24f4s-rS3900-48t6s-r

Inhaltsverzeichnis