4. INSTALLATION METHOD
3.Wiring figure
Connect the male joint of the connective wires group-1 to
the mainboard,then connect the other side of the
connective wires group-1 to the 4-core shielding wire of
the smart port.(See Fig.4-3)
If want to extent the wire ,please use extension cord
(purchased separately) . (See Fig.4-3)
4.Remove the upper part of the smart port
Insert a slot screwdriver into the slots in the
lower part of the smart port (2 places), and
remove the upper part of the smart port.
(Fig.4-4)
10
4-core shielding wire
Extension cord
(purchased separately)
The connective wires group-1
Mainboard
CN40
Fig 4-3
Slots
Fig 4-4