• Tap CLEANING
splay.
• Repeat the procedure for the other brew groups or press BACK to return
to the main screen.
• After completing the brew group cleaning operations and before using the
brew groups, discharge at least 200 cubic centimeters of water from each
brew group by pressing the P2 button (continuous delivery) without the
portafilter installed.
86 |
Tue 28 Aug 2018
Info
Settings Cleaning Groups
on the main di-
10:51
Cleaning
• Then select the brew group to be
cleaned.
Boiler