Herunterladen Inhalt Inhalt Diese Seite drucken

Wolkenstein WDD1-90A+BTY Bedienungsanleitung Seite 50

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

R
EQUIRED TOOLS
H
B
UBBLE LEVEL
1. Measure the worktop and prepare the installation opening for the extractor hood
according to the dimensions in the following figure (see below). Ensure that there
is sufficient free installation space for the installation of the extractor hood.
Always observe the installation dimensions given in the figure below!
All dimensions are given in millimetres!
A
2. Remove the two metal supports (C) from the housing of the extractor hood (B)
using a screwdriver (s. fig. below). Keep the metal supports (C) and the screws
(D / 4 pcs. M4*12) in a safe place; they will be needed again during the
installation.
Depending on model.
15
(
15
AMMER
I
NSTALLATION STEPS
W
ORKTOP
NOT INCLUDED IN DELIVERY
D
RILL AND
/
INSTALLATION OPENING
)
S
CREWDRIVER
/
OR CORDLESS
SCREWDRIVER
~
~
50

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis