Herunterladen Inhalt Inhalt Diese Seite drucken

General; Tools Required For Installation (Not Supplied); Accessories Supplied With Unit; Type Of Copper Tube And Insulation Material - Panasonic S-36PK2E5B Einbauanleitung

Vorschau ausblenden Andere Handbücher für S-36PK2E5B:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 75

1. GENERAL

This booklet briefly outlines where and how to install the air conditioning system. Please read over the entire set of instructions for the
indoor units and make sure all accessory parts listed are with the indoor units before beginning.
The installation of pipe-work shall be kept to a minimum.
This symbol shows that this equipment uses a flammable refrigerant. If the refrigerant is leaked, together with
WARNING
an external ignition source, there is a possibility of ignition.
CAUTION
This symbol shows type of flammable refrigerant contained in the system.
CAUTION
This symbol shows that the Operating Instructions should be read carefully.
This symbol shows that a service personnel should be handling this equipment with reference to the Technical
CAUTION
Manual.
This symbol shows that there is information included in the Operating Instructions and/or Installation
CAUTION
Instructions.

1-1. Tools Required for Installation (not supplied)

1.
Flathead screwdriver
2.
Phillips head screwdriver
3.
Knife or wire stripper
4.
Tape measure
5.
Carpenter's level
6.
Sabre saw or keyhole saw
7.
Hacksaw
8.
Core bits
9.
Hammer
10. Drill
11. Tube cutter
12. Tube flaring tool
13. Torque wrench
14. Adjustable wrench
15. Reamer (for deburring)

1-2. Accessories Supplied with Unit

Make sure all accessory parts listed are with the system before
beginning.
Part Name
Figure
Installation
plate
Screw (4×20)
Flare
insulation
Clamper
Q'ty
Remarks
1
For installation
5
plate installation
For flare nut
1
insulation
For fixing wires
1
(optional)
7

1-3. Type of Copper Tube and Insulation Material

If you wish to purchase these materials separately from a local
source, you will need:
1.
Deoxidized annealed copper tube for refrigerant tubing.
Cut each tube to the appropriate lengths +30 cm to 40 cm
to dampen vibration between units.
2.
Foamed polyethylene insulation for copper tubes as
required to precise length of tubing. Wall thickness of the
insulation should be not less than 8 mm.
3.
Use insulated copper wire for field wiring. Wire size varies
with the total length of wiring. Refer to 4. ELECTRICAL
WIRING for details.
CAUTION
Check local electrical codes and regulations before
obtaining wire. Also, check any specified instructions or
limitations.

1-4. Additional Materials Required for Installation

1.
Refrigeration (armored) tape
2.
Insulated staples or clamps for connecting wire (See your
local codes.)
3.
Putty
4.
Refrigeration tubing lubricant
5.
Clamps or saddles to secure refrigerant tubing
6.
Scale for weighing

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis