9.2.3.
Drilling surface position
adjustment
1. Loosen lever (B) and turn handle (A) to
vertically move the drilling surface along the
column.
2. Then fully tighten lever (B).
B
9.2.4.
Chuck removal
Grooves
Arbor
(teeth)
9.2.5.
Drilling surface alignment
adjustment
24 ▪ English
A
Shaft
Splitting wedge
Shaft
18
Chuck
9.3. Stopping the cycle
1. Press the OFF button to stop the cycle.
9.4. Switching off
1. Stop the work cycle.
2. Disconnect the plug from the wall socket.
10. Maintenance
Refer to "General safety regulations".
PPE REQUIRED
Operations carried out by the operator:
CHECK
Check the off button.
Check the control devices.
Visually check integrity of the guards.
Operations carried out by the maintenance
technician:
CHECK
Internal check of the motor's compartment. every 160 h
Check electrical equipment.
Check the motor's electrical insulation.
Cleaning operations:
CLEANING
Clean the devices of the various units
with a vacuum cleaner or brush to
remove product residues.
Clean the transparent methacrylate guard
with a cloth and antistatic detergent.
WARNING! Do not use abrasive or
acid products, scourers, spatulas
or metal brushes.
Lubrication operations:
LUBRICATION
Lubricate column, arbor, chuck.
Clean the transparent methacrylate
guard with a cloth and antistatic
detergent.
11. Scrapping and disposal
Refer to "General safety regulations".
FREQUENCY
every 8 h
every 8 h
every 8 h
FREQUENCY
every 480 h
every 960 h
FREQUENCY
every 8 h
every 8 h
FREQUENCY
if necessary
every 8 h
DP 12-941 / DP 12-943