Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Mounting In The Niche - ccei ZM20 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für ZM20:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 25
Technical Manual

4. Installation

The ZM20 & 40 (& ZM40K) are installed instead of the 300W incandescent bulbs in most of swimming pool
niches (in PAR56 format) once the electrical connection is done (on projector side).
1. Mount the 4 fixing tabs (ABS or stainless steel) (A) with the 4 screws. They are placed behind the light
and cross the nut in the heatsink. Avoid to overtighten the screws, it may damage the light.
2. Put the bezel on (B). Avoid to overtighten the screws, it may damage the light
Nova / Bahia : use the supplied screws with the bezel to fix it. The screws pass through the optical unit
by the front of the light. Use the holes highlighted with C
3. You can adapt the stainless steel brackets to the niche by speading them.

4.1. Mounting in the niche

Pass the cable through the niche's cable gland then pull it through the electrical sheath. Be sure that there is
enough cable to remove the light from the niche !
Press the light into the niche after winding the cable.
ZM20 & 40 (& ZM40K)
v3.0ML
4

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Zm40Zm400k

Inhaltsverzeichnis