- check the gate components, replace any worn or damaged parts
and then lubricate them.
N
O
and must not inhibit the gate's sliding action.
- check that a mechanical travel limit Q (absolutely necessary)
has been fitted in the opening direction and that it corresponds to
guarantee anti-derailment and gate stability.
Warning! It is the installer's responsibility to check all criti-
cal danger points, to take action and to install any devices
needed to guarantee the safety of all people using the gate
(risk analysis).

INSTALLATION INSTRUCTIONS

Important: The geared motor can be positioned either to the left or
to the right of the passageway.
INSTRUCTIONS FOR POSITIONING THE UNIT
Once the correct position has been chosen proceed as follows:
Anchoring the unit (fig. 4, 5, 6)
Important! Check the exact anchoring position with respect to the
alignment of the sliding gate.
is to be installed.
by 50 mm and then tighten down using the supplied M12 nuts.
installed, with a depth of 350 mm (the base should protrude by
about 25 mm to avoid damage by pools of water building up under
the appliance).
C
base plate is perfectly level;
- the four protruding threaded bolts are perpendicular to the base
plate;
- the surface area of the base plate is clean and free of cement resi-
due.
4
C
P
A
B
B
A
1
2
If the runner guide already exists the cement base should be
extended to take in part of the runner guide foundation. This
will stop the two foundations from giving way separately.
- Unscrew the four M12 nuts on the four threaded bolts (previously
used to block the anchor bolts) from the base of the anchor plate.
Then insert the four washers and allow them to rest on the nuts.
- Position the geared motor over the four threaded bolts
and allow it to rest on the four washers.
- Fasten in to the base using the other four washers and
adjustment nuts supplied with
the kit, making sure that the
unit remains perfectly level and
stable.
- Adjust the height if the
unit using the four grub
screws already posi-
tioned on the motor.
This will allow you to
adjust the height and
position of the motor
later on.
Fitting the toothed rack
- release the geared motor (fig. 8), lay the first stretch of the toothed
rack on the pinion and fix it to the gate, then fasten down all the
other parts along the entire length of the gate.
- after having fastened the toothed rack, realign the pinion (play
of 1 to 2 mm between the toothed runner and the pinion) using
the grub screws at the base of the geared motor.
This action will prevent the weight of the sliding gate from dam-
aging the unit when working.
6
2 mm
2
M 1
3
4
15
104,5
5