4 Set-up
4.3 Installation clearances
E
D
C
≥ 50 mm
A
≥ 50 mm
B
≥ 120 mm
C
The bottom section of the product (D) must
be level with the product's bearing area on
the wall;.
4.4 Installing the product on the
wall
4.4.1 Dimensions
35
35
6
100
1
Top grommet
2
Central attach-
ment
3
G 1/2" domestic
hot water con-
nection
42
A
B
B
C
≥ 130 mm
D
≤ 22 mm
E
19
1
2
16
3
4
5
100
240
4
G 1/2" cold wa-
ter connection
5
Bottom grommet
6
G 1/2" outside
thread
Installation instructions electronicVED exclusive 0020288446_00
4.4.2 Removing the product casing
C
B
▶
Remove the product casing as shown.
4.4.3 Installing the product
1
1
Mounting plate
2
Fixing points
1. Hold the mounting template against the
wall and mark the fixing points (2).
E
A
D
85
85
1
2
4
3
3
Cold water con-
nection
4
Domestic hot
water connection