7. Short Reference Set-up
1 Maintain Ambient Parameters
• • • • • Temperature
• • • • • Pressure
2 Installation
• • • • • At a right angle to the target material
• • • • • Maintain the distance to the fill markers, struts ect.
• • • • • Observe the block distance
• • • • • Installation in dome
3 Electrical Connections
• • • • • V15-, or V1-connectors
• • • • • Connection to power supply
• • • • • Connection to controller
Fixed Target Suppression Reset (see 7.4)
4a Adjustment in Externally Mounted State
4.1 Empty Adjustment
Simulate 0 %-level
(Integration delaytime about 15 s)
Accept empty value
Empty value accepted (red LED flashed)
Empty adjustment completed
4.2 Full Adjustment
Simulate 100 %-level
(Integration delay time about 15 s)
Accept full value
Full value accepted (red LED flashed)
Full adjustment completed
4.3 Adjustment completed
5 Operatin
Connector receptacle position T or temperature gauge
6 External Temperature Gauge
Can be connected as needed
7 Learning Static Target Suppression
7.1 Empty Adjustment in Externally Mounted State
7.2 Mount Sensor in Container
Start at 0 %-level (must occur)
Learning static target suppression
Learning process is completed after 10 - 30 seconds (red LED flashes)
7.3 Static Target Suppression Completed
7.4 Reset Fixed at Target Suppression (if programmed wrongly)
direct sensor towards free space (> 4 m)
Learning process is completed after 10 sec. (red LED flashed)
Subject to reasonable modifications due to technical advances.
20
Pepperl+Fuchs Group · Tel.: Germany (6 21) 7 76-22 22 · USA (3 30) 4 25 35 55 · Singapore 779 90 91 · Internet http://www.pepperl-fuchs.com
Connector Position
Programming connector
T
A1
A1
T
T
A2
A2
T
T
Short Reference for Set-up
Set-up
4b Adjustment in Internally Mounted State
4.1 Empty Adjustment
Start at 0 %-level in container
(Integration delay time about 15 s)
Accept empty value
Empty value accepted (LED flashed red)
Empty adjustment completed
4.2 Full Adjustment
Start at 100 %-level in container
(Integration delay time about 15 s)
Accept full value
Full value accepted (LED flashed red)
Full adjustment completed
4.3 Adjustment completed
(if necessary)
Connector Position
Programming connector
T
A1
A1
T
T
A2
A2
T
Connector Position
T
E2/E3
E2/E3
T
E2/E3
Copyright Pepperl+Fuchs, Printed in Germany