6
Commissioning
Before commissioning, carry out the following checks:
Monitor whether the mounting and installation has been executed according to
regulations.
Check the device for damage.
Remove any foreign objects.
If necessary, clean the connection chamber.
Check whether all the specified tightening torques have been observed.
7
Operation
The 8010 lighting element is installed in customer-specific systems.
The requirements during operation therefore also depend on the operating conditions and the
installation on site.
Operating principle
The indicator lamps indicate the status by lighting up or switching off a light signal.
In combination with a switchgear, they indicate the switching state. The light signal is emitted
from the enclosure via a transparent indicator lamp bezel equipped with a diffuser lens.
This makes it easy to detect a indicator lamp signal even in poor light conditions. The signal
colours red, yellow, green, blue and white are achieved by coloured lenses using colour
filtering.
8
Maintenance, Overhaul, Repair
Comply with the applicable national standards and regulations in the country of use,
e.g. IEC/EN 60079-14, IEC/EN 60079-17, IEC/EN 60079-19.
8.1
Maintenance
Check the following points in addition to the national regulations:
• Whether the device enclosure and/or protective enclosure has/have cracks or other visible
signs of damage
• Whether the clamping screws holding the conductors are fitted securely
• Whether the permissible ambient temperatures are observed
• Ensure it is being used as intended.
8.2
Overhaul
Perform maintenance on the device according to the applicable national regulations and
the safety notes in these operating instructions ("Safety" chapter).
8.3
Repair
Repair work on the device must be performed only by R. STAHL.
128912 / 8010607300
2019-10-21·BA00·III·en·01
LED Element
Series 8010
Commissioning
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
9