3. Install the power supply
Din rail installation
Installing
Checkings
Plug installation wires and power on the system. Measure voltages.
Reading must show 18 Vdc between wires '+' and '-'.
There must be no voltage between 'L' and any other wire.
L
4. Install the Resistors
Connect a 10KOhms resistor between '+' and 'L' wires in the furthest point (or points)
from the Outdoor Panel.
Checkings
L
18 Vdc
Pag 18
+
18Vdc
-
0 Vdc
1- Brown
2- Black
3- Orange
4- Gold
-
18 Vdc must be readed in the whole installation.
Uninstalling
-
L
0 Vdc
Fixing with screws
+