Herunterladen Inhalt Inhalt Diese Seite drucken

Tubes: Pump Head Sp Quick - Heidolph Hei-FLOW Value Originalbetriebsanleitung

Peristaltikpumpe
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Assembly

Tubes: pump head SP quick

Pump head SP quick features a
quick-clamp mechanic for clamping tubes.
➜ Move clamping lever to the left to open
tube bed.
➜ Turn both clamping screws counter-
clockwise as far as they will go for
maximum tube size.
➜ Place tube into open tube bed.
➜ Move clamping lever cautiously to the
right to close tube bed.
✓ When sensing significant resistance
during closing either clamping screws
are not open or tube is too large.
➜ Turn both clamping screws clockwise to
clamp tube.
➜ Check correct mounting by running a
short test.
✓ The tube may not move during operation.
➜ To adjust clamping stop rotation, switch off device and open tube bed.
➜ Turn clamping screws clockwise or counterclockwise to increase or decrease clamping
pressure.
➜ Close tube bed and repeat the test run.
Caution:
Possible tube damage
Do not force closing of tube bed. Overtightening leads to damaged
tube.
Open clamping screws completely before closing tube bed. Adjust
clamping gradually.
Check correct mounting by repeated test runs if necessary.
Clamping lever
Tube bed open
Tube bed closed
37
Clamping screws

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Hei-flow advantageHei-flow precision

Inhaltsverzeichnis