Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 73
OUT-LINE OF INSTALLATION
Installation works
location............................4
1) Preparation of Piping...12
the Outdoor Unit ..........14
5. Checking the Drainage ..............................................................................14
Indoor Unit ...................15
2) Connecting cables to the
Outdoor Unit ................16
3) Form the pipings ..........17
Installation Parts
Four Type "A" screws
Connecting cable
1
/
",
2
1
/
",
Liquid side .............
4
Insulated drain hose
Insulation materials
Additional Drain hose
(Inner Dia...............25mm)
2
Required tools
Level
Screw driver
Electric drill
Hole core drill (ø70mm)
5
/
",
3
/
"
Flaring Tools set
8
4
3
/
",
1
/
"
8
2
Screw driver
Hexagonal Wrench (4mm/5mm)
Gas-leak Detector

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

24k btu36k btu60k btu

Inhaltsverzeichnis