Herunterladen Inhalt Inhalt Diese Seite drucken

Hydraulic Circuit - Riello BAG2 AP Anleitungen Für Den Installateur Und Den Wartungsdienst

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

E -
Inlet (3/4")
U -
Outlet (3/4")
MD - Delivery, direct system (1")
RD - Return, direct system (1")
The maximum length of plumbing con-
nections between the boiler and the
BAG
2
unit must not exceed 15 m.
2
BAG
The
AP is fitted with one circulator, the
performance data to be used to size the sys-
tem, is shown in the graph.
When starting up for the first time, and at
least once a year, it is advisable to check
the pump shaft rotate.
This is necessary because, especially af-
ter lengthy periods of inactivity, deposits
and/or residue may stop it rotating freely.
Do not run the circulator without water.
Where present flo regulator devices
(thermostatic electrical or motorized zone
valves) it is better to inster a by pass on
the collector.
E
MD
7,5
7,0
6,5
6,0
5,5
5,0
4,5
4,0
3,5
3,0
2,5
2,0
1,5
1,0
0,5
0,0
0
200
400
600
800
1 - first speed
2 - second speed
3 - third speed

HYDRAULIC CIRCUIT

U
RD
CIRCULATOR
2
1
1000
1200
1400
1600
1800
2000
Capacity (l/h)
GENERAL
3
2200
2400
25

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis