Connecting up
4.5 Assembling an IE hybrid cable 2 x 2 + 4 x 0.34 with an IE IP 67 hybrid connector
4.5
Assembling an IE hybrid cable 2 x 2 + 4 x 0.34 with an IE IP 67 hybrid
connector
Procedure
Contact 2
(Orange)
Contact 1
(Yellow)
96
Remove the two inner shells of the universal sealing ring
to adapt it to the diameter of the hybrid cable.
Push the bushing, washer, adapted universal sealing
ring and the housing over the cable jacket.
Remove the following lengths of cable jacket and shield
braid:
25 mm
25 mm for the power leads.
•
30 mm jacket for the data leads (shorten the braid by
•
11 mm).
Cut off the filler at the height of the cable jacket.
19 mm
11 mm
Arrange the data leads according to the color codes on
the splice element. The following table shows the
assignment of the data leads.
Contact and color assignment of the splice element.
Contact 6
(Blue)
Contact 3
(White)
Operating Instructions (Compact), Release 08/2007, A5E00413342-05
SCALANCE W788-xPRO/RR / SCALANCE W74x-1PRO/RR