5.2

Positioning:

In order to achieve excellent performance and long-term reliability, choose a location that is:
Well ventilated, shielded from direct sunlight and away from sources of heat, with a flat and
sturdy surface free from vibration.
5.3

Electrical connection:

IMPORTANT: This machine must be earthed.
It is recommended that the system be protected with a fuse and an RCD.
Your mains electricity supply to the machine must be protected as indicated below:
- North America: 15 A protection;
- Rest of the world: 16 A protection.
For machines equipped with a variable speed drive, it is imperative that they be connected to a
junction box on a circuit fitted with a 300 mA RCD.
Note: Any problem resulting from any other type of connection will not be covered under warranty.
Before connecting your machine to the mains supply and in order to prevent the motor from burning
out when it is switched on, it is important to check that the mains supply matches the machine
specification (see machine nameplate).
This machine complies with Machinery Directives 2006/42, 2014/35, 2014/30 and is CE-marked as
proof of this compliance.
Please familiarise yourself with the safety pictograms displayed on the machine:
This pictogram indicates an electrocution hazard. Please isolate the machine
before carrying out any work on it. You will find it inside the machine on the
electrical enclosure (fig.11, n°20).
You will find the circuit diagram for the machine inside the left-hand door of the
divider (fig.11, n°21).
5.4

Commissioning:

Before commissioning, ensure that there are no extraneous objects interfering with the machine's
moving parts.
Ensure first of all (after verifying electrical compatibility) that the motor is rotating in the right direction,
if so, the head will rise when you pull the control lever towards you. If this is not the case, disconnect
the plug and switch 2 phases in it.
FULLMATIC OPTION: When the power is switched on, the green button flashes (fig.4, n°23); press
to start initialisation. If the head does not rise during this stage and the indicator flashes quickly,
disconnect the plug and switch 2 phases in it.
For machine operation, please refer to the "Operation" chapter.