Herunterladen Inhalt Inhalt Diese Seite drucken

Connecting A Home Automation Device; Installation Check Sheet - Panasonic CS-ME7NKE-Y Installationsanleitungen

Mit split-system
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 222

7. Connecting a Home Automation Device

The HA (white) 4P terminal is located on the indoor unit PCB. If a HA device will be used,
connect it to this terminal.
Also, refer to Section 9. Electric Wiring Diagram in the outdoor unit installation manual.

8. Installation Check Sheet

The strength of the installation location is sufficient to support the air conditioner weight.
The indoor and outdoor units are installed level and vertically.
The power and voltage are as specified.
Inter-unit cables are securely inserted into the terminal block.
Inter-unit cables are securely fixed.
The power cable and inter-unit cables are not connected anywhere along their paths.
The ground wire is securely connected.
Thermal insulation has been applied to the tubing connections.
Drain connections are secure and water drains properly.
Putty has been used to close the hole in the wall.
Remote controller signals are being positively received.
20

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis