6 Putting into operation
6.2 Connecting and switching on
4
1
Fume extraction system FEC W3
2
Integrated start and stop system
Fig. 5
Putting into operation
1 Connect the torch system (4), hose, and rubber connector to the fume extraction system (1).
2 Plug in the mains plug.
3 Switch on the extraction system (1) by pressing the I/Power on the control panel.
5.2 Control elements on page EN-12
NOTICE
• An external current clamp can be added on and is available as an accessory.
6.3 Current clamp (optional) on page EN-16
EN - 14
3
Suction connector
FEC W3
1
2
3
4
Torch system
BAL.0675.0 • 2019-09-16