Herunterladen Inhalt Inhalt Diese Seite drucken

Preliminary Operations - Palazzetti ECOPALEX Glass Installations, Bedienungs Und Wartungsanleitungen

Kamineinsatz
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 40
5.4

PRELIMINARY OPERATIONS

5.4.1
Adapting
First of all you must check the space available in the
appliance and the technical data sheet. If it needs
adapting by either cutting or altering the inside walls of
its stability.
to avoid overheating.
5.4.2
Combustion air intake
During operation the
"Ermetica" series products that can take in air directly
from the outside); this air must be replaced through an
Fresh air vent).
an opening for drawing in combustion air around 20-30
the product data sheet at the end of this booklet.
Make sure that the air vent is located in such a way that
it can't be accidentally obstructed.
A permanent non-closable vent cover must be placed
on the outside of the opening; in especially windy areas
or places exposed to bad weather, install rain and wind
protection elements.
If it's not possible to make a fresh air opening in the wall
must be made on the wall in the room where the stove is
installed that faces the outside.
Standard UNI 10683 prohibits combustion air being drawn
in from garages, combustible material stores or places
If there are other heating appliances in the same room,
the fresh air vents must guarantee the required volume
of air for correct operation of all the appliances
and operating in the room where the stove is located,
combustion problems may occur due to a lack of
combustion air.
takes in a certain amount
28
PA
- 5.4 -

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis