Using the underwing arm
The maximum pressure is 100 daN.
O-rings for the locking nuts on the X-clamp arms.
Inside the 2 arm locking nuts (see clamp description), there are 2 O-rings that must be replaced in case of a leak or every 6 months. These 2 seals
are necessary to avoid any risk of leakage.
These seals are O-rings d=25, group of 4. When replacing these seals, grease must be applied to them. (ref. 050440 : contact grease)
Quantity and quality of the coolant
The coolant level is important for the correct operation of the machine. It must always be between the minimum and maximum level indicated on the
trolley. Top up with demineralized water if necessary.
Replace the coolant every 2 years :
1
Switch off the power supply using the switch located at the rear of the machine (OFF position) and disconnect the unit from the mains.
2
3
Place a bucket (min. 30 l capacity) under the machine drain hole.
4
5
6
Rinse the inside of the tank with running water to remove deposits.
7
Replace the pump hose and its hose clamp.
8
Tighten the screws on the plate again.
9
Fill the tank with coolant (5l : 062511 / 10l : 052246)
10
Turn the power back on (ON position) and check for leaks.
GYSPOT INVERTER BP.LG
- Unscrew the 6 screws to open the case
of the machine.
- Place a cloth under the fitting to absorb
the liquid.
Unscrew the hose clamp and disconnect
the hose from the pump (pinch the hose
to limit leaks).
Insert the hose into the drain hole and
purge the tank.
EN
53