2.9.2

Connecting cables

The following table summarises the cables to be used.
ODU/IDU communication cable
DHW and outside air probe cable
INTERNAL UNIT
Power cable
EXTERNAL UNIT
Power cable
2.9.3
Electrical connections (fig. 20, 21, 22)
Connect the cables listed in the section below to the terminal boards of the internal and external units, referring to fig. 20, 21, 22
and the descriptions below.
Internal unit:
terminals L-N-
terminals 24-25: outdoor temperature detection probe inlet (required for activating the climate curves, enabling the electrical
heater elements inside the unit or activating an external heat source)
terminals 26-27: domestic water tank temperature detection probe inlet (required for checking temperature of the domestic
water tank and managing anti-legionella cycles)
terminals Q-P: communication cable between internal unit and external unit
terminals N-L-12: 3-way valve for domestic water
terminals N-13: contactor activation for electrical heater element power supply in domestic water tank during anti-legionella
cycles (220-240V 50Hz 100W max)
terminals 14-15: activation of external heat source e.g.: gas boiler (contact 8A (3A) 250Vac)
terminals 16-17: alarm contact (contact 8A (3A) 250Vac)
terminals 21-22: RS485 communication port to building management system or PC
terminals 5-L: domestic hot water request (when the domestic hot water tank temperature is set by a dedicated external
control; a closed contact between these terminals activates the domestic hot water request).
terminal 1 electronic board on/off and cooling remote free contact
terminal 2 electronic board on/off and heating remote free contact
terminal 3 electronic board Eco mode remote free contact
terminal 4 electronic board night-time mode remote free contact
terminal 5 electronic board domestic water activation remote free contact (already connected to terminal board 5/L)
terminal 6 electronic circuit board TA remote free contact for enabling cooling or heating
terminal L electronic board remote free contacts common connection
Terminals 1 to L are located on the electronic board; the terminals can be removed from the board to connect them more easily
and then returned to the original position (see fig. 25).
All additional cables must be long enough to enable the electric panel to open.
Single-phase external unit:
terminals L-N-
terminals Q-P-
Three-phase external unit:
terminals R-S-T-N-
terminals Q-P-
Fasten all the cables using cable grips
2.10
INSTALLATION CHECKS (fig. 9, 14)
2.10.1
Preparing for initial start-up (fig. 14)
The initial start-up of the air-water heat pump must be carried out by qualified technical personnel.
Before starting up the air-water heat pumps ensure that:
All safety conditions are met.
The air-water heat pump has been properly fastened to the support surface.
The minimum distance has been observed.
The hydraulic connections have been carried out in accordance with the instruction booklet.
The hydraulic system has been charged and bled.
The hydraulic circuit on/off valves are open
A
For communication use a multi conduc-
tor cable, number of cores 2 x section
0,34-0,50mm2, shielded, suitable for data
transmission (type LiYCY or equivalent).
B
H03RN-F 2 G 0,5 / H03VV-F 2 G 0,5
SHERPA AQUADUE SMALL
C
3 X H07V-K 4 mm
OS-
OS-
CEBSH24EI
CEBCH36EI
D
H07RN-F 3 G2,5
H07RN-F 3 G4
internal unit power supply
external unit power supply
communication cable between internal unit and external unit
external unit power supply
communication cable between internal unit and external unit
SHERPA AQUADUE BIG
2
OS-
OS-
CEINH48EI
CETNH48EI
H07RN-F 3 G4
H07RN-F 5 G2,5
OS-
OS-
CEINH60EI
CETNH60EI
H07RN-F 3 G4
H07RN-F 5 G2,5
51
2

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis