Herunterladen Inhalt Inhalt Diese Seite drucken

First Start-Up - EdilKamin LAGUNA W series Bedienungsanleitung

Holzkessel
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 162
WARNINGS BEFORE START-UP
• Installation exclusively includes connection to a chimney fl ue. For any complex and articulated
installation, contact the authorised EDILKAMIN Technical Support Centre (TSC).
• Other types of installations are not advised from those for which the boiler
was intended.
• Ensure the hydraulic system is perfectly sealed and does not have any water leaks or pressure
drops.
• Ensure the shut-off valves on the system are open.
• Ensure all the air inside the system is purged.
• Ensure there are no obstructions on the chimney fl ue and combustion air inlet.
• Ensure pressure in the circuit is at least 1.0 bar, for installations in a closed circuit.
• Ensure the thermal relief valve is connected.
• Ensure the fuel is dry and not damp.
• Ensure the fuel is suitable for the boiler.
• Ensure the combustion chamber is free and clean.
• Ensure the fl ame catalyser is positioned correctly.
• Check the electrical connection (230 V – 50 Hz) and power the boiler.
• Check the display is lighting on the command panel.
FUNCTIONING CONCEPT
Below, 7 stages of system functioning are listed.
The system guarantees reading of the statuses of the SAFETY DEVICES and ALARMS in
each functioning phase.

FIRST START-UP

ATTENTION: fi rst start-up should be carried out by an authorised EDILKAMIN Technical Support
Centre (TSC) which will check:
• all the standards already mentioned and the standards in force in the installation location were
applied;
• correct installation of the boiler and the chimney fl ue;
• that there is no danger for the boiler and the installation environment.
IMPORTANT
The manufacturer cannot be held liable for poor functioning of the boiler or any damage caused by
it to people or property if:
• fi rst start-up was not carried out in compliance with the above;
• boiler installation was not carried out perfectly in compliance with standards;
• installation of the system was carried out without complying with the standards in force.
The manufacturer declines any disputes or complaints if the standards for good functioning of the
boiler are not complied with.
INSTRUCTIONS FOR USE
1
OFF
2
NORMAL
3
MODULATION
4
STAND BY (MAINTAINING)
5
SAFETY
6
SWITCH OFF
7
BLOCK
- 68
-

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis