Herunterladen Inhalt Inhalt Diese Seite drucken

Freeing Up A Jam - FLORABEST FLH 2500 A1 Originalbetriebsanleitung

 leisehäcksler
Vorschau ausblenden Andere Handbücher für FLH 2500 A1:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 78
For safety reasons, the shredder will
not operate without a correctly at-
tached collector box (
Keep hold of branches while feeding
them into the shredder until they are
automatically drawn in.
Be aware of the possible intake speed
of the cutter and do not overload the
equipment.
Keep to the working speed of the
shredder and do not overload it.
To protect the shredder from clogging,
shred wilted garden waste that has
been left for a few days and shred thin
twigs alternately with branches.
Before you shred roots, remove any
remaining soil and stones from them
Do not shred soft, damp material such
as kitchen waste, grass or leaves:
compost it directly.
Keep a few dry branches for the end,
as they will help clean the shredder.
Only switch the shredder off when all
of the shredding material has passed
through the cylinder. Otherwise, the cyl-
inder may jam the next time you switch
the shredder on.

Freeing up a jam

Push back the operating mode selec-
tion switch (
A
operating mode selection switch to the
left.
The operating mode selection switch
does not lock into place.
1
2).
A
9) lock and turn the
2
Jammed chopping material is released.
The direction of rotation is to be changed
only until the chopping material is re-
leased.
For stubborn blockages, the distance
of the pressure plate from the blade
cylinder can be increased by turning
the adjusting screw (
wise. To switch the device back on,
turn the operating mode selection
switch (
9). When the jammed chop-
A
ping material has been released, the
pressure plate must be readjusted by
turning the adjusting screw (
clockwise.
E
Exceptionally, if this process fails
to remove the blockage, the follow-
ing option remains:
Remove the four Allen screw (14) on
the housing plate (16).
Take off the housing plate. This may
require light jerking movements, as
the housing plate also contains two
counter bearings.
The blockage can now be removed
from the equipment.
When replacing the housing plate
(16), ensure that it is positioned cor-
rectly. This is determined by the blade
shaft (18), pressure plate rod (17) and
four threads (15).
Screw on the housing plate (16) firmly
with the four Allen screws (14).
GB
11) anticlock-
A
11)
A
11

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis