Herunterladen Inhalt Inhalt Diese Seite drucken

EdilKamin MYA Installations-, Betriebs- Und Wartungsanleitung Seite 31

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 82
g. 1
A
A
g.
C
B
g. 4
C
B
INSTALLATION
g. 2
C
B
A
g. 5
C
C
C
B
FLUE PIPE COVER KIT FOR VERTICAL
FLUE PIPES - OPTIONAL EXTRA (CODE
he kit includes the following parts:
- N 1 ue pipe
ing bracket (A)
- N 2 short pipe cover elements L 25 cm (B-B1)
- N 2 long pipe cover elements L 50 cm ( - 1)
- N 8 self-tapping screws 4,2 1
o t the kit, proceed as follows:
- Fit the pipe cover
ing bracket (A - g. 1) using the screws
supplied, to the two plating closers (A1 - g. 1) at the holes
formed.
- ut a short pipe cover element on from the front (B - g. 2)
and a long pipe cover element on from the back ( - g. 2)
- Fi the bracket (A), installed previously, to the long pipe
cover element on the back ( ) using screws ( g. ).
- Fit another long pipe cover element from the front ( 1 - g.
4) and another short pipe cover element from the back (B1 -
g. 4) until a height of 8 cm is reached (equal to an overall
height from oor level, including the stove, of 169 cm).
- If you need to reach a height from oor level to ceiling of
270 cm, use another 4 long pipe cover elements ( - 1) code
761840 ( g. 5).
Detail of assembly of pipe cover elements
Rear elements
Front elements
- 31
-

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis