INSTALLATION OF THE APPLIANCE
INSTALLATION OF THE APPLIANCE
INSTALLATION OF THE APPLIANCE
INSTALLATION OF THE APPLIANCE
INSTALLATION OF THE APPLIANCE
2
The
BAG
MIX CLIMA
and can be located near the boiler or at a distance, provided
the length of the plumbing and electrical connections be-
tween the boiler and the
exceed 15 metres.
BAG
2
MIX CLIMA
The
exposed to the weather (rain, sun, ice, etc.) only if in "built-
in" installation.
Wall-mounted installation
BAG
2
MIX CLIMA
When the
supported by two expanding wall anchors (supplied) that
are suitable for the type of wall and weight of the equipment.
We recommend using pipe sleeves built into the wall in
order to limit the infiltration of water.
These pipe sleeves are not supplied with the unit.
Electrical protection level IP10D.
"Built-in" installation
2
When the
BAG
MIX CLIMA
- Provide the building work, complete with a niche of suit-
BAG
able size for the
ness of the wall (minimum indicative dimensions shown
in the figure).
BAG
- Position the
remember to open out the two support lugs to fix it more
securely.
- Protect the side edges and front while building in the
device.
Since the plumbing and electrical connections between
the system and the
BAG
within the overall size of the device itself, first position the
BAG
2
MIX CLIMA
and then the entry and exit pipes for
the system and the conduiting for the electric cables.
Electrical protection level IPX4D.
18
INSTALLATOR
can be wall-mounted or "built-in",
2
BAG
MIX CLIMA
unit do not
can be installed in positions
is wall-mounted it must be
unit is built-in:
2
MIX CLIMA
, to suit the thick-
2
MIX CLIMA
in position, and
2
MIX CLIMA
must be contained
lug