Herunterladen Inhalt Inhalt Diese Seite drucken

Tank Assembly; Construction Site - Graf Carat -S Serie Anleitung Für Einbau Und Wartung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
5.1

Tank assembly

First insert the circumferential profile seal
sealing groove in the lower half shell
seal with the enclosed soft soap.
Then insert the centring pins
mountings around the circumference.
The upper half shell
half shell
and the quick connectors
do this, each 2nd quick connector is pre-adjusted in the
1st step and is secured with a hammer and a wooden
support. The quick connectors engage in their end
position.
The
remaining
installed.
Attention: When positioning the upper half shell, it must
be ensured, under all circumstances, that the seal does
not slip out of the groove.
5.2

Construction site

Under all circumstances, the following points must be clarified prior to installation:
The structural suitability of the ground according to DIN 18196
Maximum groundwater levels which occur and drainage capability of the subsoil
Types of load which occur, e.g. traffic loads
An expert ground report should be requested from the local planning authority to determine the physical
characteristics of the subsoil.
mail@graf.info
w w w .graf.info
5.
Installation and assembly
. Lightly coat the
into the intended
is now positioned onto the lower
are installed. To
quick
connectors
into the
are then
16 / 50

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis