Herunterladen Inhalt Inhalt Diese Seite drucken

Futurelight PHS-220 Bedienungsanleitung Seite 40

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.
Procedure:
The projector should be installed outside areas where persons may walk by or be seated.
IMPORTANT! OVERHEAD RIGGING REQUIRES EXTENSIVE EXPERIENCE, including (but not limited to)
calculating working load limits, installation material being used, and periodic safety inspection of all
installation material and the projector. If you lack these qualifications, do not attempt the installation yourself,
but instead use a professional structural rigger. Improper installation can result in bodily injury and.or
damage to property.
The projector has to be installed out of the reach of people.
If the projector shall be lowered from the ceiling or high joists, professional trussing systems have to be
used. The projector must never be fixed swinging freely in the room.
Caution: Projectors may cause severe injuries when crashing down! If you have doubts concerning the
safety of a possible installation, do NOT install the projector!
Before rigging make sure that the installation area can hold a minimum point load of 10 times the projector's
weight.
When installing the device, make sure there is no highly-inflammable
material (decoration articles, etc.) within a distance of min. 0.5 m.
Follow the instructions mentioned at the bottom of the base.
the structure (truss) to which you are attaching the fixtures is secure.
Please note: for overhead rigging in public or industrial areas, a series of safety instructions have to be
followed that this manual can only give in part. The operator must therefore inform himself on the current
safety instructions and consider them.
DANGER OF FIRE!
Use 2 appropriate clamps to rig the fixture on the truss.
Make sure that the device is fixed properly! Ensure that
CAUTION!
The Moving-Head can be placed directly on
the stage floor or rigged in any orientation
on a truss without altering its operation
characteristics (see the drawing).
The fixture's base enables to be mounted in
two ways.
For overhead use (mounting height >100
cm), always install an appropriate safety
bond.
You must only use safety bonds complying
with DIN 56927, quick links complying with
DIN 56926, shackles complying with DIN EN
1677-1 and BGV C1 carbines. The safety
bonds,
carbines must be sufficiently dimensioned
and used correctly in accordance with the
latest industrial safety regulations (e. g. BGV
C1, BGI 810-3).
40/111
quick
links,
shackles
00025097.DOC,Version 1.7
and
the

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Phs-150

Inhaltsverzeichnis