Herunterladen Inhalt Inhalt Diese Seite drucken

Spare Parts - ECOLAB Turbo SMART II Betriebsanleitung

Membran-dosierpumpe
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Fig. 11: Pump head replacement
1.
Disassemble suction and pressure lines.
2.
Loosen pump head screws (Pos. 28) crosswise by 90°.
3.
Loosen pump head screws crosswise by 90° once more.
4.
Unscrew pump head screws completely.
5.
Remove pump head (Pos. 10).
6.
Unscrew diaphragm (Pos. 30), turn counter-clockwise.
7.
Clean front and back side of the diaphragm.
8.
Check diaphragm for wear (cracks, chemical attack), replace if necessary.
9.
Screw in diaphragm with 2.5 Nm.
10. Fit the new pump head in the proper position (dispensing direction arrow (Pos. 25)
must point up).
11. Insert pump head screws and tighten them crosswise by hand
Do not use tools: Do not tilt or jam the pump head when installing!
12. Gradually tighten pump head screws crosswise 180° at a time, until a clear
resistance is felt and the pump head fits completely. Not till then:
13. Tighten pump head screws crosswise with 3.75 Nm.
14. Install suction and pressure lines, and tighten union nuts by hand without using tools.
15. Activate pump.
16. Bleed pump.
17. Check that all connections are tight.
7.2

Spare parts

Description
Pump head 20 l complete PPEPKE – O-Rings in EPDM
Pump head 20 l complete PPFPKE – O-Rings in FPM
Pump head 20 l complete PVDFEPKE – O-Rings in EPDM
Pump head 20 l complete PVDFFPKE – O-Rings in FPM
Diphragm for 20 l Pump head
Maintenance and Spare parts
37
Article no. (EBS no.)
206001 (10010658)
206002 (10010663)
206003 (on request)
206004 (on request)
30601023 (10010677)
Rev. 5-06.2018

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis