Installation and wiring
1
6
Electrodes
2
3
5
4
Fig. 8:
Installation into the pipe of a 8045 with a G2'' nut
7.4.
installation into the pipe of a
8045 with a clamp connection
In order to ensure a high accuracy of the measurements and
good stability of the „flow zero" point, install the device into
the processed medium at least 24 H before calibration.
→
Install the S020 fitting into the pipe taking into account the rec-
ommendations in chap. 7.2.
→
Install the seal (mark 3 Fig. 9) on the S020 fitting.
Type 8045
FLOW
flow direction
→
Make sure that the polarizing pin (mark 4 Fig. 9) is on the fitting.
→
Insert the device (mark 1 Fig. 9) into the fitting. Position the
arrow on the side of the device in the direction of the flow: the
totalizers will increment.
→
Tighten by hand the clamp collar (mark 2 Fig. 9).
→
Charge the pipe to make sure the installation is tight.
1
4
flow direction
Fig. 9:
Installation into the pipe of a 8045 with a clamp
connection
English
2
3
15