Herunterladen Inhalt Inhalt Diese Seite drucken

Electrical Wiring With Gas Leak Control Device - Riello RS5D TL Installations-, Bedienungs- Und Wartungsanleitung

Vorschau ausblenden Andere Handbücher für RS5D TL:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3.6.2 ELECTRICAL WIRING WITH GAS LEAK CONTROL DEVICE (DUNGS VPS 504)
~
230V
50Hz
Connect the 2 nd stage thermostat (TR) to terminals T6 - T8 and
remove the bridge.
Fig. 7
A
E9250
IONIZATION CURRENT
The minimum current necessary for the control box
operation is 5 µA.
The burner normally supplies a higher current value,
so that no check is needed. Anyway, if you want to
measure the ionization current, you have to open the
connector (CN1) (see electrical scheme page 7) fit-
ted on the wire and insert a microammeter.
3087
TO BE DONE BY
THE INSTALLER
CONTROL BOX, (see fig. 7)
To remove the control box from the burner it is necessary to:
disconnect all the connectors, the 7-pin plug, the high voltage cables
and the earth wire (TB);
unscrew the bolt (A, fig. 7) and pull the control box in the direction of the
arrow.
To install the control box it is necessary to:
screw the bolt (A) in at a torque of 1 - 1.2 Nm;
reconnect all the connectors previously disconnected.
8
GB
KEY TO LAY-OUT
nd
B5 – 2
stage lock-out signal
st
h1 – 1
stage Hour counter
nd
h2 – 2
stage Hour counter
PG – Min. gas pressure switch
S3 – Remote lock-out signal
(230V - 0.5 A max.)
T6A – Fuse
D4371
TL – Limit thermostat
st
TR – 2
stage thermostat
TS – Safety thermostat
V10 – Safety valve
st
V11 – 1
stage valve
st
V12 – 2
stage valve
X4 – 4 pin plug
X6 – 6 pin plug
X7 – 7 pin plug
CN1
_
+
D4631
Fig. 8
SO

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Rs5d

Inhaltsverzeichnis