Herunterladen Inhalt Inhalt Diese Seite drucken

Routine Maintenance Plan - Entre Matic Ditec PWR25H Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 64

7 . Routine maintenance plan

Perform the following operations and checks every 6 months or based on the intensity of use of
the automation.
Disconnect the 230 V~ power supply and batteries (if present):
- Clean and lubricate the gate's rotation pins, hinges and drive screws with neutral grease.
- Check the resistance of the fixing points.
- Check the electrical wiring is in good condition.
Reconnect the 230V~ power supply and batteries (if present):
- Check the power adjustment.
- Check that all commands and safety functions (photocells) are operating correctly.
- Check that the release system is working correctly.
- Test the batteries (in continuity) if present, disconnecting power and performing a few manoeuvres
in succession. Once performed, turn on the 230 V~ power supply again.
37

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Ditec pwr35h

Inhaltsverzeichnis