Herunterladen Inhalt Inhalt Diese Seite drucken

WIKA CPP7000-X Bedienungsanleitung Seite 22

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7. Faults
Faults
Unable to build up further
pressure at highpressure
EN
generation with the spindle
pump
Unable to build up pressure, or
range cannot be reached
Slow lowering of the pressure
22
Causes
The high-pressure shut-off
valve is opened
Air is in the system
The connected device
under test has a very big
volume
Leak in the system, see
fault 2.
Small amounts of air are
compressed in the system
together with medium.
After the clamping of the
test specimen and the
reference instrument, air
may be trapped in the
system, see fault 4.
WIKA Operating Instruction, model CPP7000-X
Measures
Close high-pressure shut-off valve
correctly
Information:
In case of an opened, or
not properly closed
high-pressure shut-off
valve, the safety
overflow valve is not
activated until
approximately 100 bar
are reached, and the oil
will flow back into the
tank. Therefore, no
pressure > 100 bar can
be built up
.
After the clamping of the test
specimen and the reference
instrument, air may be trapped
in the system.
The system has to be vented
before beginning with
calibration. For this purpose,
proceed according to section
6.1.3.
Afterwards, build the pressure
back up.
The test pressure that has been
generated first drops off slightly.
After this it must be readjusted.
Please wait a short time, till the
pressure gets stable.
If the system is pressurized
quickly, it takes a certain time
(< 1 minute) until it can stabilize
thermally. The pressure should
then be adjusted accordingly.
Afterwards, build the pressure
back up.

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis