Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting Instructions - ABB Busch-Wächter Professional 220 EIB 6178 AGM-204-500 Betriebsanleitung

Ein passiv-infrarot-bewegungsmelder
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Mounting Instructions

• For cable entries from below or top remove one of the
knockout wire lead-in points provided on the unit (Fig.2,
Item 1).
• Now mount one of the two cable glands in this entry
position.
• In the installation box (Fig. 2, Item 1) pierce one seal
(Fig.2, Pos.1) using a blunt cable end.
• Insert the round cable.
• Connect the unit.
• Make sure the installation box is mounted in «top»
mounting position.
• Secure the installation box via the bores provided in
the box on a solid structure at a height of approx. 2.5
m. Only use fillister head or round head screws (head
diameter 7 mm).
• Push the enclosure (Fig.1, Item 2) onto the installation
box (Fig.2, Item 1) with setscrews pointing downwards.
• Secure the enclosure by tightening the screw (Fig.2,
Item 3).
GB

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Gj b000 6132 a0139

Inhaltsverzeichnis