Herunterladen Inhalt Inhalt Diese Seite drucken

Boiler Fixing - Riello Gulliver BS1 Type 911 T1 Montage Und Bedienungs Anleitung

Vorschau ausblenden Andere Handbücher für Gulliver BS1 Type 911 T1:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

CORRELATION BETWEEN GAS PRESSURE AND BURNER OUTPUT
To obtain the maximum output, a gas head pressure of 9.3 mbar, relatively to 912T1 model, is measured
(M2, see chapter 3.4, page 5) with the combustion chamber at 0 mbar using gas G20 with a net heat value of
3
10 kWh/m
(8.570 kcal/m
10
8
6
4
2
0
0
0
3.
INSTALLATION

3.1 BOILER FIXING

♦ Widen, if necessary, the insulating gasket holes (3) (see fig. 3).
♦ Fix the flange (5) to the boiler door (1) using four screws (4) and (if necessary) the nuts (2) interposing
the insulating gasket (3) but keep unloosing one of the two upper screws (4) (see fig. 2).
♦ Put on the flange pos. 5 the burner combustion head, tighten the flange with the screws pos. 6 and lock
the loose screw pos. 4.
N.B.: The burner can be fixed with the variable dimension (A) (see fig. 4). Anyway, make sure that the
combustion head crosses completely the boiler door thickness.
Fig. 2
2146
3
).
50
100
50,000
S7002
150
150,000
100,000
TYPE
911 T1
116 – 70
912 T1
114 –100
913 T1
128 –110
914 T1
167.5 –145
4
GB
200
200,000
Thermal power
Fig. 3
Fig. 4
A
250
kW
kcal/h
D5207
D5012
A
D5011

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis