Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Putting Into Operation; Scope Of Delivery - GEHA Primo 1500 Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Primo 1500
Before taking off the cover,
changing the location,
cleaning or anything else
other than normal operation
turn off and unplug the
paper shredder!
Maintenance and service work
may be performed only by:
• HSM customer service
• specially trained staff
(e.g. qualified electricians)
• service technicians from our
contracting partners

4. Installation

• This paper shredder should never be
placed near or over a radiator or heat
source.
• The ventilation slots must not be blocked
or covered and they must be at a
distance of at least 10 cm away from
walls or furniture.
• Make sure the mains plug is easily
accessible.
• Before plugging in the mains plug, check
that the voltage and frequency of your
local mains supply correspond to those
stated on the type plate.
8
Paper shredder

5. Putting into operation

Switching the paper shredder on
• Press rocker switch pos. 1.
1
• Rocker switch locks in.
• Green LED lights.
• Paper shredder is ready for
operation (standby).
Feed paper
See "Technical data" for sheet
capacity.
• The shredding process is started
by a photo–cell in the paper
feeding opening.
• When the paper feeding
opening is free again, the cutting
system automatically switches
off after approx. 3 sec. and
returns to standby.
Switching paper shredder off
• Tap rocker switch pos. 2.
• Rocker switch resets to zero
2
position.

6. Scope of delivery

• Paper shredder, ready for connection, in
carton packing
• 5 Bags for shredded material
• Special cutting block oil 50 ml (cross cut)
• Operating instructions
Accessories:
• Bag for shredded material,
order No.: 1.120.995.050
• Special cutting block oil 250 ml,
order No.: 1.235.997.401
english
05/04

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis