Herunterladen Inhalt Inhalt Diese Seite drucken

Multicontrol Quadro; Putting The Lifting Column Into Operation; Putting A Single Lifting Column Into Operation - Phoenix Mecano Alpha Colonne Montageanleitung

Hubsäule
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

7.7.4 MultiControl quadro

7.8 Putting the lifting column into operation

Only authorised personnel may put a lifting column into operation. The safety regulations and
instructions in these assembly instructions must be observed and followed.
Check the lifting column for any signs of damage before you start the commissioning and
observe the instructions regarding the operation of the lifting column.
If no damage can be detected, then the lifting column can be put into operation.
The lifting column in the Hall sensor version can be used both on its own and in conjunction with
several lifting columns of the same configuration.

7.8.1 Putting a single lifting column into operation

Check that the lifting column is in a safe state.
Insert the connector of the lifting column supply line in the connecting socket of the controller
marked for the drive.
Insert the connector of the hand switch connector in the connecting socket of the controller
marked for the connector assignment.
Test the function for moving the lifting column up and down by pressing the relevant key on
the manual control switch.
When moving the lifting column up and down, take note that the internal limit switch
switches off the motor in the upper and lower end positions, thus when reaching the max.
lifting route.
7. Life phases
General details /
operating conditions
Max. switching
duration
Input voltage
Output voltage
Service
Current output
Protection class
Network cable length
20 per cent
(with 10 minute play
duration)
230 VAC and 115
VAC available
36 V DC
300 VA
max. 12 A
IP 30
1.5 m
65

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis