Herunterladen Inhalt Inhalt Diese Seite drucken

RK MultiControl duo Montageanleitung Seite 62

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
7. Working life
The initialisation run can be performed with any hand switch if no error is present:
2-key hand switch
Ensure that all drives and controllers are interconnected and that the mains plug is not
connected. If you have pulled out the mains plug to perform an initialisation run, wait for at
least 30 seconds before plugging it back in.
Keep the DOWN
Plug the mains plug in and wait for about 5 seconds.
Release the keys.
Press the DOWN
lower end stop.
Press the UP
key and keep it pressed until all drives have moved to the upper end stop.
Should it be impossible to reach the top end stop, the initialisation run can be ended in any po-
sition by keeping the DOWN
the drives.
The initialisation run is complete. The controller is now ready for operation.
The operation of the 2-key or 6-key hand switch is described in sections 7.10 and 7.11.
62
and UP
keys on the hand switch pressed at the same time.
key again and keep it pressed until all drives have moved to or are at the
key pressed for 5 seconds. The position is the new end stop for

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Multicontrol quadroMulticontrol duo silent

Inhaltsverzeichnis