Herunterladen Inhalt Inhalt Diese Seite drucken

BADU Profi Eco VS Bedienungsanleitung Seite 17

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 64
NOTICE
Installing a flow monitor in the circulation line is recommended so
that a failure message can be displayed. A lengthy interruption of
the bath water circulation can be prevented in this way.
NOTICE
The following points must be observed in order to avoid motor
malfunctions:
The control line should be correctly installed by a specialist.
Assembly parallel to power lines or their load should be
avoided.
Should the control lines be extended, dangerous voltages
can occur at the digital input. These should be avoided with
isolation.
The power cables for various inputs should not be connected
to the same supply line.
Default setting:
Speed:
Priming speed:
Priming time:
Speed which can be set:
Priming time which can be set:
External controlling:
Switching behaviour Input "0":
Low
n1
05|2017
1 = 2000 min
2 = 2400 min
3 = 2850 min
= 2850 min
= 5 minutes
1000 – 3000 min
steps)
oFF, 1 – 10 min. (in 1 min.
steps)
oFF
0 cl
Priority
n2
-1
-1
-1
-1
-1
(in 10 min
n3
WG27.50.094-2-P
-1
High
Stop
EN 17

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis