Page GB-10
Materials required for assembly
Materials required for assembly
Parts list
(1) Exhaust hood
(2) Glass hood (pre-fitted in the 60 cm ver-
sion)
(3) Flue screen, 2-piece
(4) Exhaust air hose
(5) Check valve
(6) Wall mount for flue screen
(7) Retaining plate for flue screen
(8) Wall mount for exhaust hood
4 screws 25 mm, ø 4 mm (pre-fitted in
the 60 cm version)
(10) 8 screws 8 mm, ø 4 mm
(11) 4 rubber sleeves (pre-fitted in the 60 cm
version)
(12) 4 washers, conical (pre-fitted in the 60
cm version)
Tools and aids
You will need:
– Cross-slotted screwdriver, size 2
(1)
– Drill with stone bit ø 8 mm
– Measuring tape / ruler
– Level
– Pencil
– Stable stepladder
(2)
– Work gloves
– Exhaust air hose, ø 15 cm, for exhaust air
operation, or activated charcoal filter for cir-
(3)
culation air operation
We also recommend having a second person
(4)
with you to help.
(5)
The screws and wall plugs required to
mount the appliance on a wall are not
(6)
included in the package contents, as their
(7)
type and dimensions will vary depending on
(8)
the characteristics of the wall.
(9)
Please have a specialist advise you as to
which ones you need.
(10)
(11)
(12)
You will need some manual dexterity to as-
semble the appliance. Follow the assembly
steps in the given sequence. We also rec-
ommend having a second person with you
to help.