CH-BA-e-1635
 Take great care when operating the crane and follow the
general rules for crane operation.
 Check all parts (hook, carbines, rings, rope slings,
cables, chains etc.) for excessive wear or damage
 Work only with appropriate speed
 Always avoid vibrations and horizontal forces. Avoid
any kind of shock, torsion and oscillating (e.g. caused
by inclined suspending)
 Do not use the suspended balance for conveying loads.
 Do not stand or go under suspended loads.
 Do not use on building site.
 Keep an eye on suspended loads.
 Do not exceed nominal rated load of suspended balance
or any kind of attachment device on the suspended
balance.