Herunterladen Inhalt Inhalt Diese Seite drucken

bürkert 2730 Bedienungsanleitung Seite 16

Vorschau ausblenden Andere Handbücher für 2730:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7.3.1 installation of the valve body
Welded bodies
Weld valve body in pipeline system.
Other body versions
Connect body to pipeline.
7.3.2 installation of the actuator (welded
body)
installation for actuator with control function a:
notiCe!
damage to the diaphragm or the seat contour!
▶ When installing the actuator, ensure that the valve is in open
position.
Control function A pressurize the lower pilot air port with com-
pressed air (5 bar): valve opens.
Lightly cross-tighten the body screws until the diaphragm is
between the body and actuator.
do not tighten the screws yet.
Actuate the diaphragm control valve twice.
Without pressurization tighten the body screws to the permitted
tightening torque (see following table "Tab. 7: Tightening torques
for diaphragms").
16
english
Type 2730 / 2731 DN 65-100
Installation
installation for actuator with control functions B:
Lightly cross-tighten the body screws without pressurization until
the diaphragm is between the body and actuator.
do not tighten the screws yet.
Pressurize upper pilot air port of the actuator with compressed
air (5 bar).
Actuate the diaphragm control valve twice.
With pressurization tighten the body screws to the permitted tight-
ening torque (see "Tab. 7: Tightening torques for diaphragms").
Fig. 11:
Pilot air port
tightening torques
Orifice dn
tightening torques for diaphragms [nm]
(diaphragm size)
epdm
65
20
80
30
100
40
Tab. 7:
Tightening torques for diaphragms
Upper pilot air port
Lower pilot air port
ptfe
30
40
50

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

2731

Inhaltsverzeichnis