Possible configuration for HACCP control on the Powercompact controllers ( each user must programm the controller
according to the specifications defined by him for each unit):
St = 0
rd =3
AH =8 (the HI alarm trips at 8+3 =11ºC)
AL =3 (the LO alarm trips at 3-3º=0ºC)
Ad = 30 (30 min delay on the alarms)
tc = Date and time
Htd=45 (45 min after the alarm being tripped the HACCP begins to record)
The records are made on the following parameters:
HA, HA1, HA2 or HF, HF1, HF2– day of the last HA or HF event
The reset of the alarms are done by pressing the HACCP key and then by pressing the continuous cycle key ( the draft
up ) at the same time. You must press both keys for 5 seconds.
4.4 - Defrost
The cabinet defrost automatically. When this process starts the sign
switches itself off automatically.
Should it be necessary (excessive ice in the evaporator), it is possible to carry out a further defrosting process (besides those
already programmed). In order to do this press button
programmed is re-established.
It is advisable that following defrosting the doors are not opened so as to allow the temperature level to be reached more rapidly.
Defrosting water go into a tray underneath the cooling unit, where they are automatically evaporated (in models that do not
evaporate automatically, this tray should be emptied regularly).
4.5 - Cleanliness
In order to ensure perfect hygiene and conservation, it is recommended that the following regular and daily cleaning procedures
are adhered to:
•
Careful and regular cleaning of the surfaces using a damp cloth.
•
A neutral detergent and water should be used, totally avoiding those which are chlorine-based or are abrasive.
•
Wash down with pure water and dry with care.
•
The use of water-pressure jets is not recommended, in particular in the direction of the compressor.
•
Cleaning of the drainage tables is recommended and verification of the existence or not of items or residue which may obstruct
the flow of the condensation water.
4.6 - Maintenance
In order to ensure long life and correct operation of the refrigeration system, regular maintenance of the condensation should be
carried out, as follows:
•
Disconnect the cupboard from the electric current, by taking out the plug.
•
Vacuum or lightly brush the condensation, according to the track direction.
MNS00030.00
TEC
INSTRUCTIONS MANUAL
Year, month, day, day of the week, hour and
minutes when programming
lights up. Following the deferring process the same sign
for a period of 5 seconds; at the end of this further cycle the timetable
N.º
MNS00030.00
HI = AH + St
rd
St
13/13