Commissioning
Commissioning
Prior to commissioning
Before putting the product into operation, note the following warning:
CAUTION
Prior to startup read the relevant current documentation. For ordering data of the
documentation please refer to the catalogs or contact your local Siemens office.
Configuration
The CP 5621 is configured in STEP 7 or NCM PC as a CP 5611.
Reaction
For reasons of compatibility, the CP 5621 is displayed as a CP 5611 on the PC.
This is intentional and not an error.
10
5
CP 5621
Operating Instructions (Compact), 02, A5E01156749